The North Face

CLIENT: Donald Borg Construction

DURATION: 8 WEEKS

DESCRIPTION: 

Replace 70 Tons Air Cooled Chiller and 5 AHU. Installation of Hydronic System including HVAC pipes, pumps, air separator, expansion tank and glycol pump. Installation of exposed spiral ducts, grille, duct heaters and baseboard heaters. Complete temperature control system. 

1/8