top of page

The North Face

CLIENT: Donald Borg Construction

​

DURATION: 8 WEEKS

​

DESCRIPTION: 

Replace 70 Tons Air Cooled Chiller and 5 AHU. Installation of Hydronic System including HVAC pipes, pumps, air separator, expansion tank and glycol pump. Installation of exposed spiral ducts, grille, duct heaters and baseboard heaters. Complete temperature control system. 

​

© 2023 EON Mechanical Inc. 

  • Facebook Social Icon
  • Twitter Social Icon
bottom of page