top of page

The North Face

CLIENT: Donald Borg Construction

DURATION: 8 WEEKS

DESCRIPTION: 

Replace 70 Tons Air Cooled Chiller and 5 AHU. Installation of Hydronic System including HVAC pipes, pumps, air separator, expansion tank and glycol pump. Installation of exposed spiral ducts, grille, duct heaters and baseboard heaters. Complete temperature control system. 

bottom of page